Editing Purchase Orders

Jump to navigation Jump to search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Latest revision Your text
Line 16: Line 16:
 
<br>Review the [[Material Allocation]] section for more information about allocating stock.
 
<br>Review the [[Material Allocation]] section for more information about allocating stock.
  
 +
== Need to Order (Force JIT) ==
 +
If you add material to an order and you don’t want SME to attempt to allocate existing stock to the order, you can check Need to Order (Force JIT) on the Item Details tab. With this checked, no stock will be allocated for this material and you will need to place a PO for the material.
 +
<br>[[File:NeedToOrder_ForceJIT.png]]
 +
 +
<br>You can set individual inventory items to always Force JIT so you don’t have to check it when adding the item to orders.
 +
Go to the inventory item and check Force JIT (image below)
 +
<br>[[File:ForceJITByDefault.png]]
  
 
== Order Item Tab - Color Coding Material ==
 
== Order Item Tab - Color Coding Material ==
 
On the Order Items tab the inventory items will have colors associated with their Link Status
 
On the Order Items tab the inventory items will have colors associated with their Link Status
 
<br>'''Yellow Items'''
 
<br>'''Yellow Items'''
<br>- Has JIT items
+
<br>- Serialized - Has JIT & Allocated
 +
<br>- Non-Serialized - Has JIT
 
<br>'''Gray Items'''
 
<br>'''Gray Items'''
<br>- Allocated  
+
<br>- Non-Serialized - Allocated
 +
<br>- Items that are on a PO (Has Ordered Items)
 
<br>'''White Items'''
 
<br>'''White Items'''
 
<br>- Reserved Items
 
<br>- Reserved Items
<br>- Has Ordered Items - Items that are on a Purchase Order
+
<br>[[File:MaterialColorCoding.png]]
<br>[[File:MaterialLinkStatusColors.png]]
 
  
 
== Create PO for Selected Items ==
 
== Create PO for Selected Items ==
Line 111: Line 119:
 
<br>- When you receive the items on the PO, the stock will be automatically reserved for the service or install order the PO was created from.
 
<br>- When you receive the items on the PO, the stock will be automatically reserved for the service or install order the PO was created from.
  
== Need to Order (Force JIT) ==
 
If you add material to an order and you don’t want SME to attempt to allocate existing stock to the order, you can check Need to Order (Force JIT) on the Item Details tab. With this checked, no stock will be allocated for this material and you will need to place a PO for the material.
 
<br>[[File:NeedToOrder_ForceJIT.png]]
 
 
<br>You can set individual inventory items to always Force JIT so you don’t have to check it when adding the item to orders.
 
Go to the inventory item and check Force JIT (image below)
 
<br>[[File:ForceJITByDefault.png]]
 
  
 
== Create PO in Inventory Module ==
 
== Create PO in Inventory Module ==
Line 155: Line 156:
 
#    To print, select Standard Purchase Order.
 
#    To print, select Standard Purchase Order.
 
#    To email, select Email Standard Purchase Order.
 
#    To email, select Email Standard Purchase Order.
 +
  
 
== Create PO from the inventory item ==
 
== Create PO from the inventory item ==
Line 188: Line 190:
 
#    Select the item on the tab and click '''Receive Item'''.
 
#    Select the item on the tab and click '''Receive Item'''.
 
#    On the '''Receive PO Items''' window:
 
#    On the '''Receive PO Items''' window:
##       If serialized, enter the serial number on the Receive Stock tab and click '''Add'''. Select the warehouse the parts are going to. Click '''OK'''.
+
*       If serialized, enter the serial number on the Receive Stock tab and click '''Add'''. Select the warehouse the parts are going to. Click '''OK'''.
##       If non-serialized, enter the '''Receive Quantity''' on the Receive Stock tab. Select the warehouse the parts are going to. Click '''OK'''.
+
*       If non-serialized, enter the '''Receive Quantity''' on the Receive Stock tab. Select the warehouse the parts are going to. Click '''OK'''.
#   Continue receiving items. When the last item is received, you will be prompted to close the PO.
+
<br>5.   Continue receiving items. When the last item is received, you will be prompted to close the PO.
 +
 
  
<br>'''NOTE'''
 
<br>If you are receiving an item on a PO ''and you enter more than the original quantity'' and click Save you will be presented with the following prompt:
 
<br> Error - there is a mismatch between the number of items ordered and the number of items received and backordered.
 
  
<br>[[File:POMisMatchQty.png]]
+
== What to do if you receive the wrong parts on a PO ==
 +
If you receive parts on a PO that you shouldn’t have received, you will have to delete the stock you added to SME and then add the part back to the PO.
  
<br> If you click Yes it will receive more than was ordered.
+
<span style="color:orange"> Step 1 </span>: Delete the stock lot you received
  
== Receive from file for parts on PO ==
+
#    Go to the '''Inventory''' module > '''Inventory
SME will allow you to bulk receive parts from an excel file.  This will greatly increase the speed of receiving PO's with lots of items.  Follow these steps:
+
#   Click '''Search > Search Active''' Items and select the material you need to edit.
# Go to the PO you want to receive.
+
#   Go to the '''Material Details''' tab.
# Create an excel file for the parts you want to receive and save as csv file.  The csv file must be configured exactly like the following:
+
#   Select the stock lot you need to get out of SME. You can sort by date to find the one you added most recently.
## First row should include headers:  ItemNumber, SerialNumber, Quantity, Location
+
#   Click '''Delete''' on the Material Details tab.
## ItemNumbers in first column
 
## Optional Serial numbers in second column
 
## Quantity in third column.  For serialized parts this should always be 1.
 
## Optional location in fourth column.  The location name must exactly match one of your Warehouse/Inventory Locations
 
## File saved in csv, comma separated value format. Excel can format in csv by selecting save as and selecting Save as type to Comma Delimited (csv) format.
 
# One way to get a list of all items on a PO is to use the export to file. Select PO Items tab and right click in the window to export to excel
 
  
== What to do if you receive the wrong parts on a PO ==
+
[[File:DeleteButton_materialDetails.png]]
If you receive parts on a PO that you shouldn’t have received, if you have the permission to do so in your User Group, you can right click on the PO Item and select '''Reverse Receipt'''.
+
 
<br>The permission on the '''User Group is Can reverse receipt PO Items''' on the''' Administrative Clearances''' tab.
+
 
 +
<span style="color:orange"> Step 2 </span>: Add the material back to the Purchase Order
 +
 
 +
#    Go to the Purchase Order.
 +
#    If the PO is closed, you can click Actions > Re-open PO.  
 +
#    Click the '''PO Items''' tab
 +
#    Click '''New''' and add the material to the PO again.
  
[[File:ReverseReceipt.png]]
 
  
 
== How do I delete a PO that has been fully received? ==
 
== How do I delete a PO that has been fully received? ==
Line 239: Line 239:
 
<br>Make sure your warehouses have an address by going to''' Setup''' module > '''company''' > '''Lists''' > '''Warehouses'''. Select the warehouse and click Edit at the bottom. Enter the address in the window that opens (image below).  
 
<br>Make sure your warehouses have an address by going to''' Setup''' module > '''company''' > '''Lists''' > '''Warehouses'''. Select the warehouse and click Edit at the bottom. Enter the address in the window that opens (image below).  
 
<br>[[File:DefaultLocationAddress.png]]
 
<br>[[File:DefaultLocationAddress.png]]
 
<h3>Changing the Ship To location on a PO</h3>
 
If you change the Ship To location on the Shipping tab, you will be prompted with the following question:
 
<br>“The shipping location has changed. Update line items for new location?”
 
<br>[[File:ShippingLocationHasChanged.png]]
 
<br> If you click Yes, when you go to receive the items on the PO, they will default to be received into that new shipping location, shown in the Warehouse field in the image below.
 
<br>[[File:ChangeShippingLocation_ReceiveItem.png]]
 
  
 
== Next PO Number ==
 
== Next PO Number ==
Line 264: Line 257:
  
 
== Create Purchase Order for Parts Below Minimum Level ==
 
== Create Purchase Order for Parts Below Minimum Level ==
In a purchase order, you can click '''Actions''' > '''Add from Minimum Level Inventory''' to see all the items below minimum quantity and pick the items you want to place on PO. Before using this Actions option, you have to do some setup.
 
<br>[[File:POActions AddFromMinLevel.png]]
 
 
  
 
<h3>Create a Min Level Inventory Search View</h3>
 
<h3>Create a Min Level Inventory Search View</h3>
Line 331: Line 321:
 
<br>If you are adding a new stock location to the inventory item, make sure to select the location in the '''Warehouse''' drop down field. (image below)
 
<br>If you are adding a new stock location to the inventory item, make sure to select the location in the '''Warehouse''' drop down field. (image below)
  
<br>-- Locate the '''Add Qty''' field. If you aren’t adding stock to that warehouse, make sure you put '''0''' in the Add Qty field. If you need to add stock to that warehouse, you can enter it in the field.  
+
<br>-- Locate the '''Add Qty''' field. If you need to add stock to that warehouse, you can enter it in the field. If you aren’t adding stock to that warehouse, make sure you put 0 in the Add Qty field.
<br>-- Click '''OK'''
+
<br>-- Click OK
  
 
<br>[[File:AddingNEwStockLocation.png]]
 
<br>[[File:AddingNEwStockLocation.png]]
  
<br>--Click '''Edit''' to edit the stock location and open the Inventory Stock Editor again.
+
<br>--Edit the stock location to open the Inventory Stock Editor again.
 
<br>-- Enter the minimum level for that warehouse in the '''Min. Level''' field.
 
<br>-- Enter the minimum level for that warehouse in the '''Min. Level''' field.
 
<br>-- Click''' OK'''.
 
<br>-- Click''' OK'''.
Line 380: Line 370:
  
 
<br>'''**NOTE**''' - The utility does not check to see if items are already on Purchase Orders. You must be aware if you run the utility frequently and you haven't received stock on a PO, then the utility would create another PO for the item.
 
<br>'''**NOTE**''' - The utility does not check to see if items are already on Purchase Orders. You must be aware if you run the utility frequently and you haven't received stock on a PO, then the utility would create another PO for the item.
 
 
 
== Changing quantities on PO for items linked to an order ==
 
 
Below is a screenshot of a service order with two material items.
 
<br>[[File:Order_MaterialOnPO3and1.png]]
 
<br> Below is the PO these items are linked to
 
<br>[[File:PO_OrderItemsLinkedTo3and1.png]]
 
 
<h3>Increase the quantity of material on a PO</h3>
 
If you increase the quantity of a material item on the PO, the quantity of stock received over the quantity linked to the service order will go directly to your warehouse stock as available.
 
<br> In this example, the IV 103920 Lamp was change from 1 to 2 and the 2 were received on the PO.
 
<br>[[File:PO_IncreaseQuantityAndReceive.png]]
 
<br>One of the two received went into stock and reserved on the service order.
 
<br>[[File:PO_ItemReceivedReservedToOrder1.png]]
 
<br> The additional one added wasn’t associated with a service order so when received it went into stock as Available. It can now be reserved on a service order.
 
<br>[[File:AdditionalStockGoesToAvailable.png]]
 
 
 
<h3>Decrease the quantity of material on a PO</h3>
 
In the example below, the quantity on the KX-TDA30 was changed from 3 to 2 and received
 
<br>[[File:PO_DecreaseQtyAndReceive.png]]
 
<br> On the service order you will see that the two were reserved for the material on the order. You will also see the third quantity on the order is split out, holding onto the link status of Has ordered Items. It will need to be placed back on a PO since the link was broken, deleted off the order, or reserve stock for the item.
 
<br>[[File:OrderMaterialsSplitOUtReserved.png]]
 
<br> If you need to place that last quantity on a PO, you can:
 
<br>- Edit the material.
 
<br>- Click the Stock Details tab
 
<br>- Change the Item Status from Has Ordered Items to Has Jit Items.
 
<br>- Click OK
 
<br>[[File:ChangeFromHAsOrderedToJIT.png]]
 
<br> Then you can click '''Actions''' > '''Create PO for Selected Items''' on the service order to create a PO for the item.
 
 
== Changing quantities on an order if the items are linked to a PO ==
 
In this scenario, we have a service order with two material items. Both material items are on a PO and they are linked. (either created from the service order or added to the PO using actions > Add Items from Service). Below will discuss what happens if you increase or decrease the quantity of the material items on the service order when the material is on a linked PO.
 
<br>[[File:ServiceOrderWithItemsLinkedToPO.png]]
 
<br>Below is the PO with the two items from the service order
 
<br>[[File:POWithLinkedItems.png]]
 
 
<h3>Increase quantity of material on an order that is linked to a PO</h3>
 
Open the material item on the order and increase the quantity from 1 to 2. It adds another material line item to order as “Has JIT Items”
 
<br>[[File:IncreaseMaterialQuantityPastQtyOnPO.png]]
 
 
<br>If you need to add that item to an existing PO:
 
 
<br>- Go to the PO
 
<br>- Click '''Actions''' > '''Add Items from service'''
 
<br>- Select the service order and select the item that needs to be on the PO. (Image below)
 
<br>[[File:POAddItemsFromService.png]]
 
<br>The item is added to the PO as shown in image below. When you receive the item, it will be reserved on the service order it is tied to.
 
<br>[[File:AdditionalItemAddedToPO.png]]
 
 
<h3>Decrease quantity of material on an order that is linked to a PO</h3>
 
<br>- Go to Service Order and open the material
 
<br>- Click the Stock Details tab
 
<br>- Highlight the stock detail (1 in image below)
 
<br>- click the Delete button at the bottom (2 in image below)
 
<br>- Change the Quantity at the top (3 in image below)
 
<br>- Click OK at the bottom of Add Items to Order window.
 
<br>[[File:DecreaseMaterialItemQuantityWithHasOrderedItemStatus.png]]
 
<br> You will see the material is showing the correct quantity but since the stock details were released, the Link Status is at Has JIT Items.
 
<br>[[File:MaterialLinkStatusChangesToJIT.png]]
 
 
<br> The PO still has the quantity of 3. It is no longer linked to the original material detail because it was deleted
 
<br>[[File:PO_KeepsItemsWithPreviousQuantityNotLinked.png]]
 
 
<br>You have two options:
 
<br>A) Change the quantity on the material on the PO down to the quantity you need. When you receive the stock, it will not be automatically reserved on the service order because the material details were deleted on the material on the order. The stock you receive will go to your warehouse as available. You will need to manually reserve the stock on the service order.
 
 
<br>B) Delete the line item on the PO and re-add the correct quantity from the '''Actions''' > '''Add Items From Service''' option to select the order and select the correct material. When the material is added this way, the stock received will be automatically reserved on the service order.
 

Please note that all contributions to High5Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see High5Wiki:Copyrights for details). Do not submit copyrighted work without permission!

Cancel Editing help (opens in new window)